The Lentor Central Real Estate Project in Singapore is a residential development project, involving the construction of three 23-story apartment buildings, a 2-story basement parking lot, a substation, a swimming pool, and other public facilities for the LENTOR Central development.
The owner and general contractor for this project is China Communications Construction Singapore Company, responsible for the pile foundation construction. The project adopts bored pile drilling and grouting technology, with designed pile diameters ranging from 0.6 meters to 1.6 meters.
Our company successfully executed the foundation works, completing a total of 317 cast-in-place piles, meeting all quality and safety standards for the project.
The Changi East Sewage Canal Foundation Improvement Project in Singapore is overseen by the National Water Authority of Singapore and contracted to Yau Shing Engineering Private Limited. The project involves foundation improvement works for 6-meter diameter concrete caissons, utilizing concrete piles and Jet Grouting Piles (JGP) technologies.
Our company successfully undertook the construction work, deploying one set of drilling equipment and completing a total of 2,300 meters of work within the scheduled construction period from August 2022 to September 2022.
The INTRA-ARC Project for Airside Link Road at Singapore Changi Airport is managed by the Changi Airport Group (Singapore) Pte Ltd under the jurisdiction of the Airports Authority of Singapore (AAOS). The scope of this project involves the construction of bored piles, with a wide range of designed pile diameters from 0.8 meters to 1.8 meters and a maximum pile length of 87 meters.
Our company undertook the construction works with precision, successfully completing a total of 106 cast-in-situ bored piles within the scheduled construction period from December 2021 to May 2022.
The Jurong East Integrated Transport Hub is located in the central area of Jurong East, Singapore, and integrates Citizen and Community Institutions (C&CI) along with an office building above the public transportation interchange. According to the development plan, the hub will connect the existing Jurong East subway station to future subway lines, including the north-south and east-west lines, as well as the upcoming Jurong Regional Line, enabling seamless and efficient passenger transfers.
This project is managed by the Land Transport Authority of Singapore (LTA), with China Communications Construction Corporation Limited Singapore Branch as the general contractor. The scope of work includes the trial pile engineering, pile foundation construction, and pile integrity testing for subsequent engineering design parameters. The project utilizes bored pile drilling technology to construct cast-in-place piles.
The construction period spanned from December 2021 to April 2022, during which our company executed the trial piling works successfully, providing accurate and reliable data for further phases of the project.