The Fu Yee Road Kindergarten Education Centre Construction Project is located in Siu Sai Wan, Hong Kong Island, under the jurisdiction of the Hong Kong Department of Buildings. The general contractor is China Water Resources and Electric Corporation Limited.
The foundation works involved the construction of pre-bored socketed steel H-piles with the following specifications: H-pile diameter: 610 mm; and Pile length: Approximately 31 meters.
Our company successfully executed the construction works, completing a total of 77 piles during the construction period from December 2022 to June 2023.
The Third Runway Project at Hong Kong International Airport is part of a large-scale land reclamation initiative north of Airport Island, expanding the airport to 650 hectares. Upon full operation, the new runway is expected to handle an annual passenger volume of 120 million and a cargo volume of 10 million tons, enhancing Hong Kong’s status as a global aviation hub.
The project is overseen by the Hong Kong Airport Authority, with the main contractor being the Beijing Urban Construction Qishi (Construction) Joint Venture. The work includes the installation of over 49,000 meters of 7# Z-shaped steel sheet piles, setting a new depth and quantity record for similar works in Hong Kong. Additionally, the scope involved the installation of 64 King posts with a total length exceeding 3,000 meters, dewatering works comprising 96 precipitation wells, and monitoring works, including 170 observation points such as pressure relief wells and settlement monitoring points.
Our company successfully executed the construction works during the project period from September 2021 to May 2022, delivering high-quality results while setting new benchmarks in depth and scale for steel sheet pile construction in Hong Kong.
The Garden of Remembrance Retaining Wall Temporary Pile Project is located at On Hing Lane, Shek Mun, Sha Tin, Hong Kong, under the jurisdiction of the Hong Kong Special Administrative Region Government. The project was contracted to China Harbour Engineering Co., Ltd., and involved backfilling sand pipe piles and installing steel structures for foundation pits. Our company successfully undertook the construction works from August 2022 to September 2022, delivering precise execution while adhering to strict quality and safety standards.
Sinochem's Quanzhou 12 Million Ton/Year Refinery Project is the first 10-million-ton super large
refinery solely owned by Sinochem Group, located in Quanhui Petrochemical Park on the south bank
of Meizhou Bay, Fujian Province. The construction began in August 2011 and was completed in August 2012.
The construction technology adopted for this project included sunk pipe gravel piles, CFG piles, prefabricated
square piles, and PHC pipe piles. For the immersed gravel pile project, in view of the difficulty in
cutting the silt layer in the thick area, the pneumatic discharge method was adopted, which can
effectively solve the difficulty in cutting and control the construction quality.
Prefabricated square piles and pipe piles were transported by special transportation equipment to
avoid damage to the pile materials during transportation. The square pile prefabrication process pays
attention to maintenance, reduces temperature cracks, accelerates the early strength, and facilitates
the turnover of the formwork.
The project won the "2015 National Chemical Industry Quality Engineering Award", "2016 National Chemical
Engineering Construction Excellent QC Achievement Third Prize", and "2016~2017 National Quality
Engineering Award".